Topic Progress:

BIKE/RUN BRICK WORKOUT (1:15 Total time) 

1 hour ride – should be varying terrain if outside. Ride intensity should be z2 (75%)

Following the bike make a quick transition to the run 15 mins. Run the first 5 mins easy then the next 5 mins in z2 then the last 5 walk or run very easy (z1)


Skip to toolbar